# Applications | Reasonable Machines

> Twelve decisions, each made by a person with a system we built. The first three are real (clients anonymized, figures changed); the other nine are illustrative.

### The plan counted 1,210 exits toward synergy. HR had notified 100.

- Area: M&A integration, Workforce plan, Post-close
- System: Workforce plan and synergy tracking
- Real decision (client anonymized, figures changed)
- The call (HR lead): Kept every exit on the books, took the people who left before close out of synergy, and reviewed each suspected resignation one by one.
- Why a person: The import treated every exit label the same way. The HR lead knew who had actually been told.
- Draft sentence: Headcount synergy counts all 1,210 planned exits.
- As revised: Headcount synergy counts only the 100 people who were notified. The other 1,100 or so left before close or resigned. They still count as exits, just not as synergy.

### The ID says one manager. The name says another. 148 times.

- Area: M&A integration, Reporting lines, 46,346 people
- System: Reporting hierarchy rebuild
- Real decision (client anonymized, figures changed)
- The call (HR lead): Kept all 148 with their current manager until each one was confirmed. Six are still open rather than filled with a guess.
- Why a person: A looser rule would fill every line. Tested against known answers, it picked the wrong manager 300 times out of 3,374.
- Draft sentence: Load the new reporting lines wherever the matcher found a manager.
- As revised: Load the new reporting lines only where the ID and the name agree. The other 148 wait for the HR lead.

### The rule said any pay figure was a leak. That would have cut 88 benefit policies.

- Area: HR assistant, 968 policy documents, Europe
- System: HR assistant grounding
- Real decision (client anonymized, figures changed)
- The call (Engagement lead): Kept confidential pay out and let general policy in, including award tables, allowance caps, and European base pay. 930 of 968 documents made it in.
- Why a person: A keyword scan finds numbers. It can't tell a glasses allowance from a bonus plan.
- Draft sentence: The assistant excludes any document with a pay figure.
- As revised: The assistant excludes individual, incentive, and deal pay. General benefit policy and European base pay stay in.

### The board heard $140M. Operations could defend $96M.

- Area: M&A integration, Year 2 post-close
- System: Deal value and synergy tracking
- Illustrative example (invented figures)
- The call (CFO): Gave the board the number operations could defend, and left waves 3 and 4 out until each had an owner.
- Why a person: A board forgives a smaller number. It doesn't forgive a missed one.
- Draft sentence: Synergy capture is on track against the $140M year-2 target.
- As revised: Synergy capture is $96.4M, the amount operations can defend. The other $43.6M has no owner yet.

### The forecast says $3.2M favorable. One line says otherwise.

- Area: FP&A, $462M plan, Month 3
- System: Budget bridge and forecast variance
- Illustrative example (invented figures)
- The call (VP Finance): Kept the forecast, set a hard cut-over date for HR technology, and wrote down the fallback if it slips.
- Why a person: Only the owner knew the vendor would accept a firm date.
- Draft sentence: The forecast is $3.2M favorable to plan with no issues to report.
- As revised: The forecast is $3.2M favorable to plan. HR technology runs 5.8% over on dual-run licenses and cuts over by month 6.

### Payroll exits in 34 days. The parallel run hasn't started.

- Area: Separation, 34 service agreements, Day 212
- System: Transition services exit
- Illustrative example (invented figures)
- The call (Integration lead): Extended the payroll agreement 60 days at a known cost of $388K a month instead of cutting over blind.
- Why a person: The model priced the extension. It couldn't price a missed paycheck.
- Draft sentence: Payroll moves off the seller's systems in September as planned.
- As revised: Payroll moves off the seller's systems in November, after a parallel run.

### Cutting management layer L8 saves $12.3M. But 212 of those roles run plant safety.

- Area: Org design, 12,847 people, 41 countries
- System: Org design and workforce integration
- Illustrative example (invented figures)
- The call (COO): Cut L8 in field operations and kept it in the plants. That saves $7.5M instead of $12.3M, and every plant keeps its safety supervisors.
- Why a person: The model priced all three options in a second. Choosing took someone who knew what a plant supervisor is for.
- Draft sentence: Remove layer L8 across the organization, saving $12.3M.
- As revised: Remove layer L8 in field operations only, saving $7.5M. The plants keep L8.

### 57 key people account for $31.0M at risk if they leave. The riskiest one has no successor.

- Area: Talent risk, 4,212 assessed, Cycle 2026-H1
- System: Talent and succession risk
- Illustrative example (invented figures)
- The call (CHRO): Talked to the site quality director before approving the retention bonus. The move was about family, not money, so the budget went to getting a successor ready.
- Why a person: A retention model scores flight risk. It can't hear why someone is leaving.
- Draft sentence: Approve a $180K retention award for KP-014.
- As revised: Approve a six-month successor plan for KP-014, funded from the retention budget.

### The request is 14 days of inpatient rehab. Only two of four criteria are met.

- Area: Utilization review, 148 in queue, 32 due today
- System: Utilization review and decision support
- Illustrative example (invented figures)
- The call (Physician reviewer): Approved seven days with a concurrent review on day five, after reading the therapy notes the criteria don't score.
- Why a person: The criteria score what's documented. A physician reads the rest of the chart.
- Draft sentence: Inpatient rehab for UR-8829 is approved for the 14 days requested.
- As revised: Inpatient rehab for UR-8829 is approved for 7 days, with a concurrent review on day 5.

### A rival mRNA trial paused enrollment at 96 of 260. Is the window opening?

- Area: Clinical development, 2,847 tracked trials, Q3 review
- System: Clinical development decision support
- Illustrative example (invented figures)
- The call (Development lead): Read all eight sources before the review and kept the Phase 2 timeline. The pause was a protocol amendment, not a stall.
- Why a person: The model sees a paused trial. Someone who runs trials knows what an amendment looks like.
- Draft sentence: Competitor trial ST-4677 has stalled, opening a window for our Phase 2.
- As revised: Competitor trial ST-4677 has paused for a protocol amendment. Our Phase 2 timeline holds.

### One stock is at 84% of its position limit, and earnings are in two weeks.

- Area: Portfolio, $46.8M in assets, IC month-end
- System: Portfolio trend and exposure modeling
- Illustrative example (invented figures)
- The call (CIO): Cut it to 3.5% before earnings instead of waiting to hit the limit, and wrote down the price to buy back in at.
- Why a person: A limit says how much is allowed. It doesn't say how much conviction is worth.
- Draft sentence: The largest position is within policy at 4.2%, no action.
- As revised: The largest position is trimmed to 3.5% ahead of earnings, buy-back level recorded.

### Two pumps at one site share a bearing-fault signature.

- Area: Condition monitoring, 412 assets, 8 sites
- System: Condition monitoring for rotating equipment
- Illustrative example (invented figures)
- The call (Reliability engineer): Kept both pumps running until the planned stop, checked them daily, and pulled every bearing from the same supplier lot for inspection.
- Why a person: The model matched the signature. The engineer recognized the lot number.
- Draft sentence: Replace the bearings on P-1104A and C-0407 at the next planned stop.
- As revised: Replace the bearings on P-1104A and C-0407 at the next planned stop, and inspect every bearing from the same supplier lot at all 8 sites.